NHPC's Kamala Hydroelectric Project Approved

Published on: 15-Feb-2026

Share this post

NHPC's Kamala Hydroelectric Project Approved

Article Summary

Summary Notes on Kamala Hydroelectric Project

Project Overview:

  • Name: Kamala Hydroelectric Project
  • Capacity: 1,720 MW
  • Location: Arunachal Pradesh
  • Estimated Cost: ₹23,764.01 crore
  • Infrastructure:
    • Height of dam: 216 meters
    • Reservoir area: 2,600 hectares
    • River: Kamala River, tributary of Subansiri, which is tributary of Brahmaputra.

Environmental Impact:

  • Proposed felling of 23.4 lakh trees (2,340,213 trees).
  • Affects 5,440 families across 126 villages (Social Impact Assessment findings).
  • Forest Diversion: Proposal to divert 3,278 hectares of forest, with 439 hectares as very dense forest and 1,119 hectares as moderately dense.
  • Total recorded plant species in the area: 155 species belonging to 69 families, as per Environmental Impact Assessment (EIA).

Regulatory Process:

  • The Expert Appraisal Committee (EAC) on river valley and hydroelectric projects has recommended that NHPC obtain an in-principle forest clearance before receiving final environmental clearance from the Ministry of Environment.
  • The Forest Advisory Committee (FAC) will review the forest diversion proposal.
  • Approval Process: Tree felling permitted only after two-stage forest diversion approval.

Compensatory Measures:

  • Compensatory afforestation planned in Madhya Pradesh (districts: Khargone, Gwalior, Dhar, Panna) due to lack of degraded forest land in Arunachal Pradesh.

Judicial Context:

  • Previous Supreme Court order (2009): Stipulated that projects upstream of Lower Subansiri must be evaluated by the standing committee of the National Board for Wildlife.
  • The EAC has not addressed whether wildlife clearance is required, raising concerns noted by environmentalist Bimal Gogoi.

Current Concerns:

  • Lack of specific action plans for ecosystem restoration and compensatory measures.
  • Potential environmental risks due to extensive tree felling in a dense forest ecosystem.

Related Projects:

  • The Kamala project is part of several hydroelectric projects planned in the Subansiri river basin, including the 2,000 MW Lower Subansiri project, which was commissioned in December 2025.

Constitutional and Policy References

  • No direct constitutional articles or amendments mentioned, but the project implicates various environmental protection policies and regulations related to forest and wildlife conservation.

Conclusion

The Kamala hydroelectric project is a significant endeavor aimed at harnessing renewable energy but also raises critical environmental and social concerns, particularly regarding deforestation and wildlife habitat preservation. The ongoing scrutiny by environmental committees and the pending approvals highlight the intricate balance between development and ecological integrity.

Key Terms & Concepts

NHPCProponent of hydroelectric project
Kamala hydroelectric project1,720 MW energy project
Arunachal PradeshLocation of the project
Rs 23,764.01 croreEstimated project cost
3,278 hectaresForest land proposed for diversion
23.4 lakh treesNumber of trees to be felled
216 mHeight of proposed dam
126 villagesNumber of affected communities
5,440 familiesFamilies affected by project
Environmental Impact AssessmentProject assessment report
National Board for WildlifeWildlife clearance authority
2009 Supreme Court orderRegulation regarding wildlife clearance
Compensatory afforestationAfforestation in Madhya Pradesh
Kamla riverWater source for project
Subansiri riverTributary system of project
Khargone, Gwalior, Dhar, PannaDistricts for afforestation
155 plant speciesFlora recorded in the area
69 familiesPlant family classification

Mind Map for UPSC Revision

Turn UPSC Current Affairs Into Exam-Ready Notes

Reading Environment and Ecology current affairs is half the work. Revise them with ready-made notes and test what actually stuck.

  • Daily UPSC current affairs analysis
  • Revision notes, mind maps & MCQs
  • Prelims mock tests with instant results

Related UPSC Current Affairs Articles

6a73f3b7362263a66fb88838
National and International Importance06-Aug-2026

Climate Change Impacts on India-China

6a73f3f0362263a66fb8883b
Environment and Ecology06-Aug-2026

Women Honored for Environmental Contributions

6a72a31d362263a66fb8859c
Environment and Ecology05-Aug-2026

Assam Flood Due to Mining Issues

6a71505f362263a66fb88302
Environment and Ecology04-Aug-2026

Kerala's Rain-Induced Calamities Response Critique