Record Coal Production in Talabira Mines
Published on:
Share this post

Article Summary
Summary of Talbeera Coal Mines Performance
Overview:
- The Talbeera Second and Third coal mines, allocated to NLC India Limited under the Coal Mines (Special Provisions) Act, 2015, have achieved record production and supply in the fiscal year 2025-26.
- These mines are located in Odisha and are part of the government's efforts to enhance domestic coal production and energy security.
Key Facts and Figures:
- Production Achievement:
- In FY 2025-26, the mines recorded the highest annual coal production of 19.14 metric tons, marking an 11.28% increase from the previous year.
- The highest daily production was 126,138.07 tons on March 21, 2026, and the highest monthly production was 3.39 metric tons in March 2026.
- Supply Details:
- The mines supplied a total of 17.69 metric tons of coal in FY 2025-26.
- Breakdown of supply: 10.72 metric tons to the power sector and 6.97 metric tons to the non-regulated sector.
- Cumulative Production and Dispatch:
- Since the start of operations, the cumulative coal production reached 72.23 metric tons and cumulative dispatch was 70.89 metric tons by August 14, 2026.
Technological Advancements:
- Implementation of a Digital Logistics Management System (DLMS) for monitoring coal transport and dispatch digitally.
- Significant reduction in average processing time at vehicle entry points: from 1.42 minutes to 0.54 minutes.
- Use of advanced machinery and systems including dust control measures, GPS-based fleet management, and drone surveys.
Environmental and Safety Measures:
- Over 129,490 trees planted in and around the mining area.
- Installation of 11.68 kW solar energy capacity for local infrastructure.
- No fatal accidents reported since the mine's establishment; safety measures include a safety management plan and training programs.
Community Impact:
- Direct employment for 1,277 individuals and approximately 2,000 indirect jobs created.
- Skill development programs benefiting 106 individuals in local communities.
- Corporate Social Responsibility (CSR) expenditure of ₹5.32 crore in FY 2025-26 for health, education, and infrastructure development.
- Additional ₹4.20 crore planned spending in FY 2026-27 for various community initiatives.
Conclusion:
- The Talbeera Second and Third coal mines exemplify the successful implementation of coal resource management under the NA allocation framework, contributing significantly to India's energy security and local socio-economic development. The achievement of record production and sustainable practices reflects the government's vision for a self-reliant and developed India.
Key Terms & Concepts
| Talabira Second and Third Mines | Record coal production site |
| NLC India Limited | Allotted coal mines operator |
| Coal Mines (Special Provisions) Act, 2015 | Legislation for coal allocation |
| 19.14 metric tons | Highest annual coal production |
| 1,26,138.07 tons | Highest daily coal production |
| 3.39 metric tons | Highest monthly coal production |
| 17.69 metric tons | Highest annual coal supply |
| Digital Logistics Management System (DLMS) | Technology for coal transport monitoring |
| 72.23 metric tons | Cumulative coal production by 2026 |
| 70.89 metric tons | Cumulative dispatch by 2026 |
| 64,288 plants | Planted within mining lease area |
| 65,202 plants | Planted outside mining lease area |





